Tilbury Auto

Infrastructure

From wire rod to warranty, one roof.

Forging, machining and finishing run across the group's units in Rohtak, backed by an in-house lab for hardness, XRF, salt-spray, torque and profile checks.

750 T & 450 T presses4 × bolt makers25 × CNC lathes5 × VMC
Hot forging press

Five stages, start to despatch.

Every part moves through the same sequence, and the test certificate travels with the box.

01 / 05

Hot forging

25 × CNC lathes5 × VMC4 × bolt makers750 T & 450 T presses
01

Hot forging

750 T & 450 T hammer presses

Two hammer presses of 750 and 450 tonnes take billet to near-net shape, so the grain follows the part instead of being cut across it.

02

Cold forging and forming

3 × presses · 4 × bolt makers · part former

Three 450 tonne cold presses, four National bolt makers and a Sakamura part former shape fasteners cold and to size, holding strength and finish without removing metal. Automatic thread rolling and tapping finish the thread.

03

CNC machining

25 × CNC lathes · 5 × VMC

Twenty-five CNC lathes and five vertical machining centres turn and mill to your drawing, batch after batch.

04

Zinc flake coating

Fully automatic line · RoHS

Fully automatic zinc flake coating applied in-house, then proven in our own salt-spray chamber. Pre-applied thread-locking patch to your specification.

05

Tested, then shipped

In-house lab

Hardness, roughness, profile projector, air gauge, XRF, coating thickness, salt spray to ASTM B117. All in our own lab. The certificate travels with the box.

Certified quiet confidence.

The systems OEM vendor teams audit for are already in place, backed by an in-house lab of hardness, XRF, salt-spray, torque and profile instruments.

IATF 16949:2016Automotive quality system
ISO 9001:2015Quality management
ISO 14001:2015Environmental
ISO 45001:2018Health and safety
RoHSRestricted substances

Certificate copies shared on request for vendor onboarding.

Metrology bench with inspection instruments

Send a drawing.
Get a straight answer.

Upload your part drawing and engineering will come back with feasibility, tooling and lead time.

Replies within one working day